Founder’s previous experience
Erzurum 2011 Winter Universiade Ski Jumping Facilities Landslide Stabilisation
- Location
- Erzurum
- Period
- 2015
- Sector
- Buildings and facilities
- Role
- Geotechnical Design Engineer
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Landslide stabilisation; ground improvement, slope modelling, inclinometers, back-analysis and 2D numerical analyses.
About the project
Geotechnical improvement works were carried out to stabilise a landslide reaching a depth of 15 m and to enable construction of the chairlift line planned in the same area.
Geotechnical and soil parameter reports, settlement and bearing capacity calculations, a ground improvement report and a liquefaction potential assessment were prepared; slope stability modelling, evaluation of inclinometer readings and back-analysis led to a remedial design, and limit equilibrium and two-dimensional numerical analyses were performed.