Founder’s previous experience
4th Ring Road Improvement — Study, Design and Construction Supervision
- Location
- Kuwait
- Period
- 2024–2025
- Sector
- Highways and interchanges
- Role
- Geotechnical Design Engineer
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Geotechnical and numerical analyses; bearing capacity, liquefaction, slope stability and deep foundation design.
About the project
Within the project “Study, Design and Supervision of the Construction and Maintenance of 4th Ring Road Improvement”, geotechnical calculations and numerical analyses were performed and reviewed.
The work included bearing capacity calculations, liquefaction potential assessment, slope stability analyses, remedial systems for slope stability problems and deep foundation design.