Founder’s previous experience
Completion Works of the Şile–Ağva Road (Km 61+900–84+800) and Ağva–Kandıra Road (Km 84+800–109+000)
- Location
- İstanbul – Kocaeli
- Period
- 2025–2026
- Sector
- Highways and interchanges
- Role
- Geotechnical and Geological Department Manager / Geotechnical Design
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Geotechnical assessment; settlement and bearing capacity; foundation design; liquefaction analysis and ground improvement design.
About the project
Geotechnical assessment reports were prepared for the structures along the route, including settlement and bearing capacity calculations, shallow and deep foundation design and liquefaction potential assessment; suitable ground improvement methods were selected and designed.
Technical coordination and communication among the client, administration and design teams were carried out.