Founder’s previous experience
Çeşmeli–Erdemli–Silifke–Taşucu Motorway — V1 and V4 Viaducts
- Location
- Mersin
- Period
- 2025
- Sector
- Highways and interchanges
- Role
- Geotechnical and Geological Department Manager / Geotechnical Design
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Geotechnical and numerical analyses for the V1 and V4 viaducts; bearing capacity, slope stability and deep foundation design.
About the project
Geotechnical calculations and numerical analyses were performed and reviewed for the V1 and V4 viaducts.
The work included bearing capacity calculations, slope stability assessments and deep foundation design, together with coordination between the client and design teams.