Founder’s previous experience
Çorum–Delice High-Speed Railway Line — K-19 Bridge
- Location
- Çorum – Kırıkkale
- Period
- 2025–2026
- Sector
- Railways
- Role
- Geotechnical and Geological Department Manager / Geotechnical Design
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Geotechnical and numerical analyses for the K-19 Bridge; bearing capacity, slope stability, deep foundation and ground improvement design.
About the project
Geotechnical calculations and numerical analyses were performed and reviewed for the K-19 Bridge.
The work included bearing capacity calculations, slope stability assessments, deep foundation design and the selection and design of suitable ground improvement methods.