Ankara–İstanbul High-Speed Railway, Doğançay Realignment Phase I — Ali Fuat Paşa–Doğançay Section, Sakarya Bridge
- Location
- Sakarya
- Period
- 2026
- Sector
- Railways
- Role
- Geotechnical and Geological Department Manager / Geotechnical Design
This project is a work our founder Yusuf Nazlıoğlu was involved in during a previous role, outside Vertex Proje.
Scope of services
Settlement and bearing capacity for the Sakarya Bridge; deep foundation, liquefaction and cantilever pile shoring design.
About the project
As part of the infrastructure works for the Ali Fuat Paşa–Doğançay section (Km 132+560–143+661, reverse direction), geotechnical assessment reports were prepared for the structures of the Sakarya Bridge.
The work included settlement and bearing capacity calculations, deep foundation design, liquefaction potential assessment and the design of cantilever pile shoring systems.