2024–2025
Alat–Astara Railway — Preparation of Design and Cost Estimate Documents
Railway rehabilitation; bearing capacity and settlement analyses for overpasses and bridges, and geotechnical design reports.
-
2024–2025
4th Ring Road Improvement — Study, Design and Construction Supervision
Geotechnical and numerical analyses; bearing capacity, liquefaction, slope stability and deep foundation design.
-
2023–2025
Ahmadbeyli–Horadiz–Minjivan–Aghband Road
Geotechnical assessment and engineering evaluations for tunnel applications.
-
2023–2025
Kalbajar–Lachin Road — Preparation of Detailed Designs
Geotechnical assessment and engineering evaluations for tunnel applications.
-
2023–2025
Toganali–Kalbajar Road — Preparation of Detailed Designs
Geotechnical assessment and engineering evaluations for tunnel applications.
-
2023–2025
Halkalı–Kapıkule Railway Line, Ispartakule–Çerkezköy Section
Geotechnical and numerical analyses for NATM tunnels, bridges and viaducts; foundation, slope, ground improvement and tunnel lining design.
-
2023–2025
Halkalı–Kapıkule Railway Line, Halkalı–Ispartakule Section
Geotechnical assessment; settlement and bearing capacity; shallow/deep foundation, liquefaction and anchored pile shoring design.
-
2016
İstanbul–Ataköy Camp Education Centre Project
Soil/rock parameters; settlement and bearing capacity; DSM, slope stability, anchored shoring and 2D analyses.
-
2016
Samsun Terme Indoor Swimming Pool Project
Geotechnical assessment; settlement and bearing capacity; DSM ground improvement and liquefaction analysis.
-
2016
Tokat Turhal Youth Centre Project