Image: D130 Highway Başiskele Interchange Corridor Project, Phase I — Revision of Detailed Design — Founder’s previous experience
The projects in this list are works our founder Yusuf Nazlıoğlu was involved in during previous roles with other organisations. They were not carried out by Vertex Proje; the founder’s role is stated for each project.
13 projects · Page 1 / 2
-
2025–2026
Completion Works of the Şile–Ağva Road (Km 61+900–84+800) and Ağva–Kandıra Road (Km 84+800–109+000)
Geotechnical assessment; settlement and bearing capacity; foundation design; liquefaction analysis and ground improvement design.
-
2025–2026
Ankara–İzmir High-Speed Railway, Salihli–Manisa Section (Km 439+000–501+000)
Geotechnical and numerical analyses for viaducts and bridges; bearing capacity, slope stability, deep foundation and ground improvement design.
-
2025–2026
Çorum–Delice High-Speed Railway Line — K-19 Bridge
Geotechnical and numerical analyses for the K-19 Bridge; bearing capacity, slope stability, deep foundation and ground improvement design.
-
2025
Road and Highway Structures Projects in Kocaeli — Ro-Ro Junction–Seka Tunnel Section
Bearing capacity, slope stability, deep foundation and ground improvement design for bridges and connecting roads.
-
2023–2025
Halkalı–Kapıkule Railway Line, Ispartakule–Çerkezköy Section
Geotechnical and numerical analyses for NATM tunnels, bridges and viaducts; foundation, slope, ground improvement and tunnel lining design.
-
2016
İstanbul–Ataköy Camp Education Centre Project
Soil/rock parameters; settlement and bearing capacity; DSM, slope stability, anchored shoring and 2D analyses.
-
2016
Samsun Terme Indoor Swimming Pool Project
Geotechnical assessment; settlement and bearing capacity; DSM ground improvement and liquefaction analysis.
-
2016
Tokat Turhal Youth Centre Project
Geotechnical assessment; settlement and bearing capacity; DSM ground improvement, liquefaction and mitigation design.
-
2016
Ordu Stadium Project
Geotechnical assessment; settlement and bearing capacity; DSM ground improvement, liquefaction and mitigation design.
-
2016
Düzce Akçakoca Sports Centre Project